Murkomen: Repair of roads, bridges damaged by floods to cost Sh30 billion
National
By
Emmanuel Kipchumba
| May 15, 2024
The government needs Sh30 billion to repair critical infrastructure including roads and bridges damaged by floods across the country.
Speaking in Lamu Wednesday, during an inspection of Gamba section of the Lamu-Witu-Garsen road that was damaged by floods, Transport Cabinet Secretary Kipchumba Murkomen said movement of goods and people had been disrupted.
"We are heavily impacted by the floods, we have lost infrastructure, especially the roads and bridges. From the assessment we have done, it is estimated that between Sh25 billion to Sh30 billion is needed to restore the damaged infrastructure," said Murkomen.
Murkomen said that the water volume and flow depth was still high and the road remained impassable for vehicles.
READ MORE
Behind-the-scenes rush as clock ticks for sale of Bamburi Cement
Pension industry seeks to flex its muscle in large State projects
Treasury goes for UAE loan as IMF cautions of debt situation
Traders claim closure of liquor stores, bars near schools punitive
Adani fallout is a lesson on accountability and transparency fight
Sustainable finance in focus for Kenyan banks as Co-op Bank feted
What forcing Google to sell Chrome could mean
How talent development is shaping Kenya's tech future
Street-style snappers reclaim the heart of Nairobi
Huawei, charity partners to empower women with digital skills in Kenya
"The situation has been worsened by the spillover from the Seven Forks dam upstream, and experts expect this situation to remain so for some time," he said.
He said the situation has forced the travelers to use canoes to connect and complete their journeys from Mombasa to Lamu and back.
"We appreciate the private sector for providing the boats and for adhering to safety standards even as we look for a solution," said Murkomen.
Murkomen said that the disruption affected cargo movement from the Port of Lamu to neighbouring countries.
"The Ethiopian government imported 60,000 metric tons of fertiliser through the Lamu port but the moment it docked, we experienced floods. We are exploring alternative routes to address this problem as we prepare to begin the restoration of critical infrastructure across the country," he said.