Murkomen: Repair of roads, bridges damaged by floods to cost Sh30 billion
National
By
Emmanuel Kipchumba
| May 15, 2024
The government needs Sh30 billion to repair critical infrastructure including roads and bridges damaged by floods across the country.
Speaking in Lamu Wednesday, during an inspection of Gamba section of the Lamu-Witu-Garsen road that was damaged by floods, Transport Cabinet Secretary Kipchumba Murkomen said movement of goods and people had been disrupted.
"We are heavily impacted by the floods, we have lost infrastructure, especially the roads and bridges. From the assessment we have done, it is estimated that between Sh25 billion to Sh30 billion is needed to restore the damaged infrastructure," said Murkomen.
Murkomen said that the water volume and flow depth was still high and the road remained impassable for vehicles.
READ MORE
Debate on diaspora bond sparks mixed reactions among Kenyans
End of an era as Mastermind Tobacco to go under the hammer
Irony of lowest inflation in 17 years but Kenyans barely making ends meet
2024: Year of layoffs as businesses struggle to stay afloat
Honda and Nissan expected to begin merger talks
How new KRA guidelines will impact income tax calculation
Job loss fears as Mbadi orders cost-cutting in State agencies
Diversifying Kenya's exports for economic prosperity
"The situation has been worsened by the spillover from the Seven Forks dam upstream, and experts expect this situation to remain so for some time," he said.
He said the situation has forced the travelers to use canoes to connect and complete their journeys from Mombasa to Lamu and back.
"We appreciate the private sector for providing the boats and for adhering to safety standards even as we look for a solution," said Murkomen.
Murkomen said that the disruption affected cargo movement from the Port of Lamu to neighbouring countries.
"The Ethiopian government imported 60,000 metric tons of fertiliser through the Lamu port but the moment it docked, we experienced floods. We are exploring alternative routes to address this problem as we prepare to begin the restoration of critical infrastructure across the country," he said.